Case studies

Client Results: Case Studies from the Factory Floor

Each case study below demonstrates how we’ve helped manufacturers in the automotive, rail, and mechanical processing industries overcome their toughest production challenges. The results are real, the numbers are verified, and the approach is reproducible.

%
Changeover time
%
Production volume
Production Target

Executive Summary: Faced with a 23% increase in demand, this automotive supplier was bottlenecked by 160-minute changeover times. By applying SMED, we reduced changeover time by 75%, enabling a 32% production volume increase—without new equipment.


The Challenge

Our client, a Tier 1 supplier for the automotive industry, urgently needed to scale production from 223,000 to 275,000 units per week.

The main obstacle? A high product mix causing frequent, lengthy changeovers. Each changeover took 160 minutes on average, eating into valuable production time and creating a growing backlog.

The Solution

We implemented the SMED (Single-Minute Exchange of Dies) methodology. This wasn’t just a theory exercise—we went to the shop floor and:

  • Separated internal and external setup tasks, moving 60% of the work to be done while the machine was running.
  • Standardized the remaining internal steps to eliminate waste and variation.
  • Introduced a simple but powerful rule: the setup operator must stay at the line for 10 minutes after each changeover to verify quality and prevent minor stoppages.

The Results (in under 10 weeks)

  • -75% changeover time (from 160 to 40 minutes)
  • +32% production volume increase
  • 275,000 units/week – 100% of the new demand met on time

The Bottom Line: The client eliminated their backlog and regained the ability to respond flexibly to market changes—without investing in a single new machine.

Graph showing production volume increase from 223,000 to 275,000 units per week after SMED implementation

Production volume evolution before and after SMED implementation (weeks 1-4: baseline; weeks 5-10: post-implementation)

“Working with Adrian, we managed to exceed our initial volume targets in a short time. We made the ‘impossible’ become possible.”
— Ion Cucu, Production Director, NTN-SNR Rulmenti

📅 Schedule a Free 15-min Call


%
Execution time
%
Waiting time
days
Delivery time (down from 12+)

Executive Summary: A manufacturer of welded assemblies needed to scale output from 22 to 50 units per week to meet demand. The bottleneck was a rigid cell structure at the subassembly welding stage. By reorganizing cells to focus on single subassemblies across all products, we reduced execution time by 71%, eliminated waiting times, and increased capacity by 78%—all with the same resources and headcount.


The Challenge

Our client, a manufacturer of welded assemblies, was facing a critical situation. Demand had grown to 50 units per week, but their production could only deliver 22—a gap of 78% that meant lost orders and dissatisfied customers.

The technological process involved 7 stages: Cutting → Sandblasting → Subassembly Welding → CNC Milling → Tack Welding → Final Welding → Painting.

The main bottleneck was at the Subassembly Welding stage. The existing cell structure was rigid—each cell was dedicated to producing all subassemblies for a single product. This created:

  • Long waiting times – parts would queue for hours.
  • Uneven cell loading – some cells were overloaded, others idle.
  • Low flexibility – the product mix dictated capacity, not the other way around.

The Solution

We reorganized the cell structure from product-based to subassembly-based.

Before: Cell 1 → Product A (all subassemblies) | Cell 2 → Product B (all subassemblies) | Cell 3 → Product C (all subassemblies)

After: Cell 1 → Subassembly X (for all products) | Cell 2 → Subassembly Y (for all products) | Cell 3 → Subassembly Z (for all products)

This simple but fundamental shift meant:

We also balanced the cells by redistributing the welding of common parts.

Each cell became a specialist in one subassembly, improving efficiency.

The product mix no longer dictated capacity—any cell could produce for any product.

The Results

  • -71% execution time for 30 pieces of Product C (from 12 days to 3.44 days)
  • 6 days maximum delivery time for the full 50-piece order (down from 12+ days)
  • -96% waiting time (from 240 minutes to just 10 minutes)
  • +78% production capacity achieved—from 22 to 50 units per week

Production Volume Evolution (Weekly Output)

Graph showing production stabilization from 22 to 50 units per week after implementing cells reorganization at a welded assemblies manufacturer.

The graph shows significant production variations before the improvements. Within just 2 weeks after optimization, production increased by over 30%, and the process has remained stable.

The Bottom Line: The client now meets 100% of market demand without additional headcount or new equipment. The production flow is predictable, and the team has regained control over their delivery commitments.

📅 Schedule a Free 15-min Call


€Mil

Increase in annual turnover
%

Reduction in overtime
%

Reduction in employee turnover

Executive Summary: An IKEA furniture supplier was struggling with late deliveries and couldn’t keep up with demand. Production was fragmented, internal transport consumed 20% of production time, machine downtime accounted for 25%, and employee turnover was at 47%. By applying One Piece Flow, SMED, process standardization, and performance indicators, we increased production volume by 25%, boosted turnover by over €1M, and reduced overtime by 50%—all within 12 weeks.


The Challenge

Our client, a furniture manufacturer for IKEA, was facing a critical situation. Despite high demand, they were constantly behind on deliveries. The more they pushed, the more chaotic production became.

The root causes were clear:

  • Fragmented production – the focus was on machine performance, not process flow.
  • Internal transport waste – operators spent 20% of their time moving materials instead of producing.
  • Excessive downtime – changeovers, adjustments, and minor breakdowns accounted for 25% of production time.
  • High employee turnover – at 47%, the workforce was unstable, affecting quality and consistency.

The result? A factory that worked hard but couldn’t deliver on time.

The Solution

We implemented a comprehensive transformation based on four pillars:

  1. One Piece Flow – We redesigned the production layout to create a continuous connection between operations and operators, eliminating unnecessary movement and waiting.
  2. SMED (Single-Minute Exchange of Dies) – We drastically reduced changeover times, allowing for faster product switches without sacrificing quality.
  3. Process Standardization – We standardized operations and procedures, reducing performance variation between operators to a maximum of 5%. Consistency became the new norm.
  4. Performance Indicators – We introduced metrics that linked effort directly to deliveries: Finished Production Volume and Cost per Product (Total Hours Worked / Finished Products) . Managers could now see clearly where to focus their attention.

The Results (in 12 weeks)

  • +25% increase in productivity and production volume – demand was finally met.
  • +€1M+ increase in annual turnover – by eliminating the backlog and fulfilling orders on time.
  • Cost reduction – through process optimization and elimination of unnecessary stock.
  • Improved management accountability – managers used KPIs to drive performance.
  • -50% reduction in overtime – leading to higher employee satisfaction.
  • -57% reduction in employee turnover – from 47% to under 20%.

Production Volume Evolution

Line chart showing weekly production volume increase over 12 weeks after implementing One Piece Flow and SMED.

Weekly production output showing steady increase after process optimization in week 0.

The Bottom Line: The client went from chaos to a predictable, continuous flow. They now meet IKEA’s demand consistently, with a motivated workforce and a healthier bottom line.

“The collaboration with AVO Lean Consulting brought clarity and predictability to our production. The results were visible in less than three months.”
— Production Manager, IKEA Supplier


Is your factory constantly fighting fires instead of flowing smoothly?

📅 Schedule a Free 15-min Call

Do any of these challenges sound familiar?

If your factory is dealing with bottlenecks, high employee turnover, or missed delivery deadlines, you’re not alone. Each case study above started with a similar story.

Let’s have a 15-min call to identify your biggest bottleneck—free of charge.

* I typically respond within 4 hours. Your time is valuable, and so is mine.